C2 PROJECT
C2 Photo Album
album:Easter_2026
Old and incorrect pins!


New pins for the lifting links/radius rod (left) and Union link/combination lever (right) - Easter 2026
Valve spindle sleeves ready for grinding (or turning) - Easter 2026


New reverser weighshaft crank pins pressed in, in situ. - Easter 2026
Slide bars fitted with castle nuts and split pins. Easter 2026


Slide bars fitted with castle nuts and split pins. Easter 2026
The two spare return rods (eccentric rods) chosen to be used. - Easter 2026


Valve Spindle with sleeve. - Easter 2026
Valve spindle sleeve removed. - Easter 2026


New and old reverser latch plates side by side. - Easter 2026
New reverser latch plate. - Easter 2026


New reverser assembled (left) and the old latch plate (right). This really is an excellent piece of machining by Erle. - Easter 2026
Oil grooves machined into the white metal of the cross head slippers - Easter 2026


Little end pins (Gudgeon pins) with the new keys machined and in place. - Easter 2026
Cross heads with bridge pieces over the little end pins (gudgeon pins) to mount the union links. Easter 2026


Cross heads with oil pipes fitted by Jack. - Easter 2026
Reverser latch built up with weld and re-machined by Erle to the correct dimension. Easter 2026


Erle machining the notches in the new reverser latch wheel. - Easter 2026
Erle tapping to holes in the reverser latch plate to fix the handle. - Easter 2026


New reverser assembled (left) and the old latch plate (right). This really is an excellent piece of machining by Erle. - Easter 2026